  1. Replies
    5
    Views
    6,921

    Re: Power purchase renewal

    Think you will get 3.5p now if you renewed with them!!!

    Never found Opus to be competitive since they were taken over
  2. Replies
    5
    Views
    6,921

    Re: Power purchase renewal

    Who was that with?
  3. Re: Weather: Fridays Look Ahead - Up to Christmas Eve with the JMA

    Your 10 video is the same information which was released on the farmers guardian weather forecast yesterday
  4. Thread: 150kw Vs 225kw

    by Tanner
    Replies
    37
    Views
    27,519

    Re: 150kw Vs 225kw

    If you applied for pre accreditation before 1st October you will be subject to a 20% Cut from present rate, after that date you will be subject to a 30% cut unless of course you got your turbine...
  5. Thread: 150kw Vs 225kw

    by Tanner
    Replies
    37
    Views
    27,519

    Re: 150kw Vs 225kw

    Crack on mate!! and remember preliminary accreditation is not full accreditation. you should have had one up by now anyway 30% Tarriff cut , and an old 130Kw wind turbine recipe for disaster

    There...
  6. Re: Weather: Mondays Look Ahead - Hints of a colder end to November

    There is an awful lot of probably`s used in this forecast. :(:(
  7. Replies
    10
    Views
    6,067

    Re: Power Purchase Contract Renewal

    When I checked the Market and renewed in July Opus Energy were offering the best deal.

    It probably has changed since then as the Market seems to be firming
  8. Replies
    3
    Views
    1,750

    Re: JD 6520 premium PTO

    the solenoid would have failed. happened to ours. the solenoid is located in between the lift arm yokes, the damp and dust etc collects around it , fix 30 quid or so iirc
  9. Thread: Argosy 50Kw

    by Tanner
    Replies
    32
    Views
    16,623

    Re: Argosy 50Kw

    I really think that storage would be limited to gusts over seconds rather than several hours or even days of energy which you are looking for.

    If you could invent something you could be very rich
  10. Thread: Argosy 50Kw

    by Tanner
    Replies
    32
    Views
    16,623

    Re: Argosy 50Kw

    Is this what you are referring to ??http://www.artemisip.com/applications/wind-turbines

    If it is , it aint a Storage system to which you are looking for:undecided::undecided:
  11. Replies
    10
    Views
    6,067

    Re: Power Purchase Contract Renewal

    My current PPA is with Opus, looking for comparative quotes as it is up for renewal
  12. Replies
    10
    Views
    6,067

    Re: Power Purchase Contract Renewal

    Spoke to them last year and were only offering the export price you can receive from the fit scheme??
  13. Replies
    10
    Views
    6,067

    Power Purchase Contract Renewal

    Hi

    Has anyone renewed their PPA recently??, how are you finding prices in relation to last year?

    Mine is to expire at the end of July so starting to look around for best prices
  14. Thread: Argosy 50Kw

    by Tanner
    Replies
    32
    Views
    16,623

    Re: Argosy 50Kw

    I very much doubt you could put a 50KW Generator into a 250KW size( i.e 25-30 metre diameter rotor) wind turbine, it would blow up!!!.

    Are hydraulic accumulators capable of storing electrical...
  15. Thread: Argosy 50Kw

    by Tanner
    Replies
    32
    Views
    16,623

    Re: Argosy 50Kw

    I think you really need to study the half hourly data a 250Kw produces over a day using your sample windspeeds, you will then find that it will probably be impossible to store that much surplus...
  16. Thread: Argosy 50Kw

    by Tanner
    Replies
    32
    Views
    16,623

    Re: Argosy 50Kw

    I don't really get your thoughts on needing a 250KW rated turbine and derating to 50KW, I really doubt the economics of it would stack up.

    The windflow turbines are class 1 machines and will...
  17. Replies
    22
    Views
    8,569

    Re: wriggle room , turbine

    Who is going to check anyway?? Unless you were moving it to a different field I would not worry to much about it
  18. Re: Weather: Sunday's Look Ahead - Cool & Unsettled

    Sorry, I assumed your "Look Ahead" Forecasts were weather forecasts and you posted the link to them on this Forum that reason.
  19. Re: Weather: Sunday's Look Ahead - Cool & Unsettled

    Your forecasts are becoming very vague and short of detail, even though it takes around 8 minutes to deliver it. Would it not be better to focus on the uk, differentiating England North and South,...
  20. Replies
    20
    Views
    7,323

    Re: sound survey costs?

    It can also depend on other Turbines in the area, these have to be taken into the calculation. Usually if the desktop modelling shows any un connected property above the 35 Db threshold a full...
  21. Thread: Hub Height ?

    by Tanner
    Replies
    7
    Views
    3,148

    Re: Hub Height ?

    Try this link http://www.vgenergy.co.uk/energy-calculator/ If you scroll through the various Turbines with different hub heights you should be able to get some idea of the effect of hub height v...
  22. Replies
    29
    Views
    13,705

    Re: EWT 500kw project

    Our DNO Northern Powergrid insist on a Block/Brick built Substation, would have been loads cheaper and quicker to use a grp unit
  23. Replies
    29
    Views
    13,705

    Re: EWT 500kw project

    As long as you have the substation design drawings any brick/ block layers will do your job, I got a local builder to do mine and did a tremendous job!!, even a pitched roof and spouts
  24. Thread: lec's

    by Tanner
    Replies
    5
    Views
    2,115

    Re: lec's

    You maybe don't get them as you are receiving ROCs ??
  25. Thread: lec's

    by Tanner
    Replies
    5
    Views
    2,115

    Re: lec's

    Use the Ofgem register to transfer them to a purchaser, usually issued about 2 months in arrears . They can be viewed in Certificates section of the register