    lely robot project

    [IMG][/IMG][IMG][/IMG]


    shed extension going up and the open plan collecting area

  2. #2
    Member
    Join Date
    Feb 2013
    Location
    bedfordshire
    Posts
    78

    Re: lely robot project

    Very good and topical use of Man cage. Two stars for you. ;-)

  3. #3
    Senior Member Tullyvernon's Avatar
    Join Date
    Feb 2013
    Location
    Ulster
    Posts
    711

    Re: lely robot project

    Looking good so far, keep the pics coming as work progresses

  4. #4
    Member
    Join Date
    Feb 2013
    Location
    south lanarkshire,scotland
    Posts
    33

    Re: lely robot project

    My office is going next door to the clean room for the computer n stuff, I am going to make it all insulated and warm and dry, timber lino floor etc so wellies would not be allowed in. But I saw a set up that had the computer in a small 5ft square room with concrete floor and a aqua drain in it so it could be hosed easily if in with dirty wellies. What everyones opinon on this.

    Now clean room floor coverings. I am thinking concrete floor with rubbert mats fitted on top with a few holes cut in over the drain, so the chemicals from robot don't eat into concrete and corrode it. Thoughts?

  5. #5
    Senior Member deere2140's Avatar
    Join Date
    Feb 2013
    Location
    Lanarkshire
    Posts
    184

    Re: lely robot project

    Tiles
    The views posted are mine and not those of my employers

  6. #6
    Junior Member
    Join Date
    Feb 2013
    Posts
    27

    Re: lely robot project

    Any more pictures of the progress? how many robots you putting in? A4's?

    TIA

  7. #7
    Senior Member Tullyvernon's Avatar
    Join Date
    Feb 2013
    Location
    Ulster
    Posts
    711

    Re: lely robot project

    Would like to see more pics of how this is getting along too

  8. #8
    Member
    Join Date
    Feb 2013
    Location
    south lanarkshire,scotland
    Posts
    33

    Re: lely robot project

    Theres not much happening at the moment, shed is mostly sheeted just tricky bits to sheet to the old roof. Slurry tank starts in a few weeks thats the next phase.

  9. #9
    Member
    Join Date
    Feb 2013
    Location
    south lanarkshire,scotland
    Posts
    33

    Re: lely robot project

    [IMG] knocking down old walls for where the robot,clean room and office is going.

    [/IMG][IMG]


    [/IMG]starting to dig the slurry pit

  10. #10
    Senior Member Tullyvernon's Avatar
    Join Date
    Feb 2013
    Location
    Ulster
    Posts
    711

    Re: lely robot project

    Good job, work seems to be going along nicely

  11. #11
    Member
    Join Date
    Feb 2013
    Location
    south lanarkshire,scotland
    Posts
    33

    Re: lely robot project

    [IMG][/IMG]
    the first wall getting poured of slurry tank


    [IMG][/IMG] first wall done now ready for 2nd pour done today no messing about.

  12. #12
    Member
    Join Date
    Feb 2013
    Location
    Northern Ireland
    Posts
    54

    Re: lely robot project

    Is there any reinforcing steel tied between the walls and floor?

    How do you plan on supporting the slats? Columns and beams or a central wall?

  13. #13
    Member
    Join Date
    Feb 2013
    Location
    south lanarkshire,scotland
    Posts
    33

    Re: lely robot project

    Yes there is starter bars from floor up the wall and folded mesh in to. The next bit is setting the pillars in the center to carry the beams and slats

  14. #14
    Member
    Join Date
    Feb 2013
    Location
    south lanarkshire,scotland
    Posts
    33

    Re: lely robot project



    breaking down old wall into existing slurry pit





    the new slats going on taking shape now





    precast trough all fitted now to use it for first time





    starting to build the clean room and office walls

  15. #15
    Senior Member
    Join Date
    May 2013
    Location
    Augher, Co. Tyrone
    Posts
    743

    Re: lely robot project

    Lookin good!! Great to see a bit of work being done on an existing farm, not some sterile new-build (not that there's anything wrong with new build) look forward to seeing more.

  16. #16
    Member
    Join Date
    Feb 2013
    Location
    Orkney
    Posts
    54

    Re: lely robot project

    Are you fitting a head rail to the trough? Who makes those?

  17. #17
    Member
    Join Date
    Feb 2013
    Location
    south lanarkshire,scotland
    Posts
    33

    Re: lely robot project

    Yes IAE are making posts and head rail to keep cows out trough, there has been a few in it already. Pre cast trough was supplied by mj harrison made by moore concrete. Slurry tank contruction by V-Tech.

  18. #18
    Senior Member Profi Farmer's Avatar
    Join Date
    Feb 2013
    Location
    Wexford/Lancashire
    Posts
    243

    Re: lely robot project

    Amazed to see the old slurry tank walls made with brick. Only ever seen them done with mass concrete. Thanks for sharing the pics.

  19. #19
    Member Ranger's Avatar
    Join Date
    Feb 2013
    Location
    The Lowlands
    Posts
    65

    Re: lely robot project

    Quote Originally Posted by Profi Farmer View Post
    Amazed to see the old slurry tank walls made with brick. Only ever seen them done with mass concrete. Thanks for sharing the pics.
    Our old slurry channel was the same.

    Built in the late 1970's I believe.

  20. #20
    Senior Member
    Join Date
    May 2013
    Location
    norf
    Posts
    108

    Re: lely robot project

    Quote Originally Posted by Profi Farmer View Post
    Amazed to see the old slurry tank walls made with brick. Only ever seen them done with mass concrete. Thanks for sharing the pics.
    ours is made of breeze block, 80's i think it was put in.

  21. #21
    Member
    Join Date
    Feb 2013
    Location
    Orkney
    Posts
    54

    Re: lely robot project

    Quote Originally Posted by jd everytime View Post
    Yes IAE are making posts and head rail to keep cows out trough, there has been a few in it already. Pre cast trough was supplied by mj harrison made by moore concrete. Slurry tank contruction by V-Tech.
    Can I ask how high the outer edge of the trough is? Also head rail design? We having trouble with cows getting knocked in trough it seems hard to have a head rail that isn't too restrictive

  22. #22
    Member
    Join Date
    Feb 2013
    Location
    south lanarkshire,scotland
    Posts
    33

    Re: lely robot project

    The feed trough is 600mm high 1.5m wide. Not sure of the exact measurements of headrail off hand but I, ll look it up for you. Never had any bother with old trough when it was 675mm high

  23. #23
    Member
    Join Date
    Feb 2013
    Location
    south lanarkshire,scotland
    Posts
    33

    Re: lely robot project

    more progress
    [/IMG]


    [/IMG]


    moving the robot into place
    [/IMG]

    all in place now
    [/IMG]

  24. #24
    Senior Member Tullyvernon's Avatar
    Join Date
    Feb 2013
    Location
    Ulster
    Posts
    711

    Re: lely robot project

    Great progress now!! Taking shape nicely, when do you hope to get all up and running?

  25. #25
    Member
    Join Date
    Feb 2013
    Location
    south lanarkshire,scotland
    Posts
    33

    Re: lely robot project

    Very soon meant to be tomorrow but thats not happening so thursday maybe but not sure if they start upnear weekend so prob be tuesday next week

  26. #26

    Re: lely robot project

    Quote Originally Posted by jd everytime View Post
    Very soon meant to be tomorrow but thats not happening so thursday maybe but not sure if they start upnear weekend so prob be tuesday next week

    What did you end up using for the floor covering? I was visiting a robot farm on fir who started in March and had used resin paint on the floor that was lifting already! I'm thinking swimming pool changing room type tiles

  27. #27
    Member
    Join Date
    Feb 2013
    Location
    south lanarkshire,scotland
    Posts
    33

    Re: lely robot project

    I put mats down in office and clean room from farmat. Just hope they don't stain or go off colour from the brush cleaner.

  28. #28
    Senior Member
    Join Date
    May 2013
    Location
    Augher, Co. Tyrone
    Posts
    743

    Re: lely robot project

    Looks brilliant!! All the best for start-up, make sure you've pleanty of coffee, red bull and pro-plus!!!!

  29. #29
    Member
    Join Date
    Jul 2013
    Location
    Finland
    Posts
    99

    Re: lely robot project

    Keen to hear more and see more pictures!

    About the materials, we're running two robots and the "working area" and all is just plain concrete, what i've heard of those materials is just they're a nuisance and pain in the ass after some time, so when we're gonna put a new shed, it's gonna be just concrete again. Relatively easy to keep clean and it stays.
    Check my dairy management software! http://www.naka.fi/download/naka.exe

  30. #30
    Senior Member
    Join Date
    May 2013
    Location
    Augher, Co. Tyrone
    Posts
    743

    Re: lely robot project

    JD everytime and others who have robots, if it is possible, I think it would also be interesting to see how your cows were milked PRIOR to your technical transformation!!

    Perhaps we could start a separate thread of 'my old parlour' photos? I'm sure many of you recorded for posterity and historical evidence the last milking in the parlour? How else will our grandchildren understand what we're on about?!!